Details: laying and jointing pvc pipe. heading app item) removing of silt from inside of manhole including the cost of loading, unloading, cartage & shifting of malba/sludge from the side, t&p, safety equipment etc. complete in all respect, as desired and directed by the engineer-in-charge. 21.93.2) providing and fixing sfrc manhole covers and frames marked with is: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the engineer-in-charge. laying and jointing pvc pipe. heading
Sector: Urban Authority