Details: (11.58) roviding and applying two coats white cement based putty of approved brand and manufacturer, over plastered surface and grinding the surface smooth with sand paper to get en even and smooth finish including cost and carriage of all material , labour charges, scaffolding, sundries etc. complete (11.95.1) finishing walls with acrylic smooth exterior paint of required shade : 1. new work (two or more coat applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) (12.114) providing and fixing of roller blinds on windows complete with material and labour complete with push up and down arrangement as per approved design / colour and engineer-in-charge. (n.s) providing and fixing ceiling led light 600mm x 600mm philips and bajaj. (n.s) analysis of rate for providing and fixing crompton high flo wave plus 400 mm 60w oscillating wall fan- kd white complete in all respect.
Sector: Urban Authority