Details: 26.13.2digging holes in all kinds of soil, and refilling the same, with the excavated earth, mixed with well decayed farmyard manure (cost of well decayed farm yard manure to be paid separately) hole 0.90 metre dia and 0.90 metre deep. 26.3.1supplying at site good earth /soil-less media and/ or organic matter, preparation of top dressing mixture or media 0.00 0.00 0.00 supplying at site of work well-decayed farm-yard manure from any available source, approved by the engineer-in-charge including screening through sieve of i.s.designation 16 mm with 5 km lead and supply of good earth making mixture in ratio of 1:2. 26.53watering of trees, shrubs, ground covers etc. through tractor tanker of 5000 litre capacity including cost of water with all leads and lifts and including cost of water, fuel ,filling of tanker, watering at site with all leads and lifts as per direction of officer - in-charge.(for 1 no. tree 30 litres water per plant 27 no . irrigations per year , shrub 20 litres/ per p
Sector: Urban Authority