Description: Construction of thermally insulated MS portable cabins with base platform and electrical connections drying shed laying of water line electrical cable and optical fibre laying of paver blocks and of solar street lights at GCNEP Name of Work Construction of thermally insulated MS portable cabins with base platform and electrical connections drying shed laying of water line electrical cable and optical fibre laying of paver blocks and of solar street lights on octagonal poles with concrete base at Isolated Plot GCNEP for experimental cultivation of mutated rabi and kharif crops under SARRT activities in Nuclear Agriculture
Details: Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete (Min. 345 Mpa Steel) Painting with synthetic enamel paint of approved brand and manufacture to give an even shade Two or
Sector: Research center