Details: sub head - roads loading of malba by mechanical means dispose of malba /debris stone (building or pitching ) sand earth flyash bajri shingle spalls brick bats brick ballast and stone metal including loading unloading carriage to dumping place as directed by the engineer incharge wet mix macadam providing , laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant ,carriage of mix plant to site of work laying in uniform layers with paver in sub-base/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density complete as per technical clause 406 of mort & h specifications. prime coat @ 0.85kg per sqm providing and applying primer coat with bitumen emulsion ss on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85kg/sqm complete as per technical clause 502 of mort&h s
Sector: Industry Development