Details: earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. b mechanical means (a) depth upto 3 m complete in all respect as per design, drawing, specifications and instructions of engineer -in-charge. cement concrete 1:4:8 with stone aggregate 40mm gauge, mixing by mechanical means using concrete mixer volumetric type complete in all respect as per design, drawing, specifications and instructions of engineer -in-charge. shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) complete in all respect as per design, drawing, specifications and instructions of engineer -in-charge. centering and shuttering for columns (circular or curved in plain) complete in all respect as per design, drawing, specifications and instructions
Sector: Water Resource Department