Details: excavation of soil using hydraulic excavator and hydraulic tractor trolley i/c cutting and loading in trolley and transporting to the embankment locations with all lifts and leads upto 450 mtr. (csr item no. 19.38-(a) ) earth work in excavation in foundations trenches etc. in all kinds of soil where pick-jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres (csr item no. 6.6) rehandling of earth work with avg. lead 60mtr (csr item no. 19.38). extra for wet earth work from bottom of excavation upto level of sub soil water as per item no. 1(a) (csr iitem no. 6.2-d(i)) extra for wet earth work from level of sub soil water upto 30 cm above as per item no. 1(b) (csr item no. 6.2-d(ii)) extra for wet earth work for depth abov
Sector: Water Resource Department