Description: BALANCE WORK OF RESTORATION OF ROAD CUT ON LINK ROAD THERMAL COLONY TO JOGANAND NAME OF WORK BALANCE WORK OF RESTORATION OF ROAD CUT ON LINK ROAD THERMAL COLONY TO JOGANAND
Details: CIVIL WORK Providing and laying surface dressing in single coat using crushed stone aggregates of specified size on a layer of bituminous binder VG-10 @ 1kg per sqm laid on prepared surface after cleaning the road surface and rolling with 8-10 tonne smooth wheeled steel roller complete as per technical clause 509 of MORT&H specifications Providing and applying tack coat with penetration grade bitumen VG-10 using bitumen pressure distributor at the rate of 0.40 kg per sqm on the prepared bituminous surface/granular surface treated with prime coat after cleaning the surface complete as per technical specifications Providing, laying and compaction of open - graded premix surfacing of 20 mm thickness consisting of crushed stone aggregates of specified grading premixed in a Continuous type hot mix plant with bituminous binder VG-10 @ 1.46kg per sqm, laid with Paver Finisher Mechanical and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades complet
Sector: Road development