Description: Estimate for Construction of VR Bridge at RD 6800 and repairing of existing fall bridge at RD 4000 of Kakrala Minor--Name of Work: Estimate for Construction of VR Bridge at RD 6800 and repairing of existing fall bridge at RD 4000 of Kakrala Minor
Details: Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil in ordinary soil Mechanical Means depth upto 3Mtr Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly locations with all lifts and leads with avg lead of 3.6 km with last 2.1 km katcha Compaction of Earth extra for laying earth/fly ash as per specifications in 20 cm. Layers and dressing but excluding cost of rolling & Extra for watering the earth/fly ash laid in 20 cm layers as per specifications for compaction & Extra for rolling to specifications. Laying plain/ Reinforcement cement concrete in sub-structure complete as per drawing and technical specification PCC Grade M-15. Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC grade M
Sector: Water Resource Department