Details: dismantling and of economizer coils of jt boiler no-2 job includes hydraulic testing & complete box up in all respect. supply of economizer coil for jt boiler no-2 as per drg no.: ce/14-01/2017(jkec001-03-31-2-001 ) material confirming to bs/3059/1987/part-2 erw 360 with ibr certificate along with hydraulic test pressure 1000 psig/cm2size:50.8 mm od x 3.66mm thk (9swg) development length of one coil: 93.327 mtrno. of coils :18 nosmaterial make: tata
Sector: Cooperative Federation