Details: part i (construction) making 50mm x 50mm furrows 45 degree to the centre line of the road and at 1 meter interval in the existing bituminous wearing coarse including sweeping and disposal of excavated material within 1000 metres lead complete as per technical (full surface area will be measured for payment dismantling stone pitching or soling - stone pitching dry dismantling brick work tile, masonry or tile lining - dismantling dry brick work compaction of earth work & preparation of sub grade including loosening, leveling of earth 225mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the table 300-2 as per technical clause 305 of mort&h specifications. providing and laying of brick on end edging 6.83cm wide, 11.11cm long and 22.86cm high half brick deep including excavation, refilling and disposal of surplus earth up to 50 mtr complete as per punj
Sector: Road development