Details: dismantling brick edging in strengthening portion as per csr item no.8.5(i) dismantling of stone pitching. csr 8.2(a) making 50 mm x 50 mm furrows 45 degree to the center line of the road and at one meter interval in the existing bituminous wearing coarse including sweeping and disposal of excavated material within 1000 meters lead complete as per technical (full surface area will be measured for payment). csr 24.10 compaction of earth work & preparation of sub grade including loosening, leveling of earth 225mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the table 300-2 as per technical clause 305 of mort&h specifications. (in case of link roads earth work to be done by villagers) providing and laying of brick on end edging 6.83cm wide, 11.11cm long and 22.86cm high half brick deep including excavation, refilling and disposal of surplus earth up
Sector: Road development