Details: taking out existing cc interlocking paver blocks from footpath/ central verge/pavement, including removal of etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of engineer-in-charge.(8.43) providing and laying 80 mm thick factory made cement concrete interlocking paving blocks of m-40 grade manufactured by block making machine equipped with steel mould clamped to a strong vibratory table with hydraulic pressure for compaction of concrete as per irc sp 63 -2014 and of approved size and design / shape laid in ordinary grey colour and pattern over and including 40 mm thick compacted bed of coarse sand, filling the joints with fine sand etc, all complete as per directions of engineer-in-charge.(14.139) relaying new laying dismantling of flexible pavement by mechanically means [csr 24.3a] relaying of gsb [csr 24.8 labour rate] wet mix macadamproviding, layin
Sector: Road development