Details: videography of all the roads included in dnit to be done before the start of any work. videography to be undertaken in the presence of an officer not below the rank of sde / je. two video copies of each road to be submitted by contractor. it most cover all reaches and aspects of the road. dismantling brick edging as per csr 8.5 i dismantling stone pitching complete in all respects as per csr 8.2a credit of brick bats obtainted from dismantling of brick edging credit of old bricks obtainted from dismantling of brick edging making 50 mm x 50 mm furrows 45 degree to the center line of the road and at one metre interval in the existing bituminous wearing coarse including sweeping and disposal of excavated material within 1000 metres lead complete as per technical clause 404 of mort&h specifications (full surface area will be measured for payment) providing and laying of brick on end edging 6.83cm wide, 11.11 cm long and 22.86 cm high half brick deep including excavation, refilling and
Sector: Road development