Description: Estimate for restoration of water course at RD 23750R of Mukanpur Disty by brick lining Estimate for restoration of water course at RD 23750R of Mukanpur Disty by brick lining
Details: - Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods. Dressing of Earthwork : New work or remodelling work Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads for filliing. (Earth to be arranged by Contractor.) Earth Filling with ordinary soil in 15 cm layers including, ramming, watering and consolidating lead upto 30m Dag-belling with Single Kassi minimum 7.5 cm depth. Dressing of Bed and Preparation of Sub-grade for Lining First Class Burnt Brick laid in 1:6 Cement Sand Mortar in foundation and plinth. (for Bed & Side walls) 10 mm thick Cement Plaster 1:4 on Side Walls 10 mm thick Cement Plaster 1:4 on Floors (on bed and top of side walls) Supplying and fitting of RC
Sector: Water Resource Department