Details: name of work :- "repair of 3no. existing 50 ohsr, disinfection unit electrically based and repair of existing pump chamber 3.70 x 4.30mtr, providing, laying, cutting, jointing & testing of pvc pipe 6kg/cm2 for distribution, including cost of excavation, dismantling & relaying of dry brick on edge paving and dismantling of metalled road, cc flooring, house hold water connection with water meter & development of water works site etc. complete in all respect and all other works contgent there to". (completion period 6 month)
Sector: Water supply and Sewerage