Details: dismantling of old bridge (rcc main slab) (csr item no. 8.6-e) earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. (csr item no. 21.1-b) excavation of soil using hyraulic excavator and hydraulic tractor trolly i/c cutting and loading in trolly and transporting to the embankment locations with all lifts and leads with disposal/carraige from 0 upto 450m (csr item no. 19.38-a) excavation of soil using hydraulic excavator and hydraulic tractor trolley i/c cutting and loading in trolley and transporting to the embankment locations with combined lead 2.11 km i/c first 2.11 km katcha with all lifts and leads (csr item no. 19.38-(a,b,c) ) earth work excavation in ordinary soil, exclusive of compensation of earth for pudding work (csr item no. 6.2/f) extra for compaction
Sector: Water Resource Department