Details: earth work in excavation in foundations trenches etc. in all kinds of soil where pick-jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. cement concrete 1:8:16 with stone aggregates 40mm gauge mixing by mechanical means using concrete mixer volumetric type cold twisted detormed (ribbed/ tor steel) bars (fe 500 grade as per is 1786-2008) , for r.c.c works, where not including in the complete rate of rcc including bending and binding placing in position complete shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) centering and shuttering for columns (square or rectangular or poly gonal in plain) reinforced cement concrete m-20 mechanically batch mixed using batch type
Sector: Road development