Details: earth work in excavation in foundations trenches etc. in all kinds of soil where pick-jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. cement concrete 1:8:16 with stone aggregates 40mm gauge mixing by mechanical means using concrete mixer volumetric type first class burnt brick work laid in cement sand mortar 1:5 in foundation and plinth 12.5 mm thick cement plaster 1:5 precast cement concrete kerbproviding and laying factory made rubber moulded smooth finish cement concrete kerb m-20 grade 250mm high with bottom width 165mm and top width 115mm made over strong vibratory table and fixing with cement mortar 1:2 as per mort&h specifications construction of granu
Sector: Road development