Details: earth work in excavation in foundations, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonary in 15 cm layers with compaction including disposal of surplus soil as directed with in a lead of 30 meters. cement concrete 1:4:8 with stone aggregate 40mm gauge mixed by mechanical means using concrete mixer volumetric type reinforced cement concrete m-25 mechanically batch mixed using batch type concrete mixer as per is: 1791 and vibrated by needle but exculding steel reinforcement centring and shuttering in foundation and plinth. reinforced cement concrete m-25 mechanically batch mixed using batch type concrete mixer as per is: 1791 and vibrated by needle but exculding steel reinforcement centring and shuttering in super structure. cold twisted detormed (ribbed/ tor steel) bars (
Sector: Industry Development