Details: laying ec bags filled with c.c. 1:3:6 i/c sewing & laying in position within 30 mtrs. in dry complete in all respect laying ec bags filled with cement concrete 1:3:6 including sewing & laying in position within 30 metres in water complete in all respects excavation of soil using hydraulic excavator and hydraulic tractor trolly i/c cutting and loading in trolly and transporting to the embankment locations with all lifts and leads (3 km for rural areas) excavation of soil using hydraulic excavator and hydraulic tractor trolly i/c cutting and loading in trolly and transporting to the embankment locations with all lifts and leads (5 km for urban areas) weaving wire netting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm or 25 cm x 7.5 cm mesh including supply of msa wire 4mm as per pwd specifications. sand filling under floor and in wells of bridge foundation including handling within 100 meters dressing of earth work extra for dressing of dowel kad
Sector: Water Resource Department