Details: earth work earth work excavation in ordinary soil, exclusive of compensation of earth. kassi work undressed involving a average horizontal throw upto 2.0 meters and an average vertical lift upto 0.5 meters including breaking of clods. earth work undressed with acombined lead upto 15 meters including breaking of clods. dressing of earth work new work of remodling workunit dag belling :- dag belling single kassi minimum 7.5 cm depth earth filling concrete suupplying and laying dry brick bats brick work first class burnt brick laid in cement sand mortar 1:6 i for bed and side walls plastering and pointing 10 mm thick cement plaster 1:4 on side walls 10 mm thick cement plaster 1:4 on floors lining dressing bed and preparation of sub grade for lining. dismantling dismantling brick work tile. masonary or tile lining in cement supplying of rcc shutter with one extra frame for nakka branch offtakes any other item
Sector: Water Resource Department