Details: earth work in excavation in foundations trenches etc. in all kinds of soil where pick-jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. cement concrete 1:5:10 with 40mm guage stone aggregate first class burnt brick work laid in cement sand mortar 1:6 in foundation and plinth damp proof course 4 cm thick of cement concrete 1:2 :4 with 2 coats of bitument 20/30 at 1.65 kg first class burnt brick work laid in cement sand mortar 1:6 in first storey upto 4 metres above plinth level. reinforced cement cocrete m-30 mechanically batch mixed using batch type concrete mixer & in super structure cold twisted detormed (ribbed/ tor steel) bars (fe 500 grade as per is 1786-2008) , for
Sector: Road development