Details: earth work in excavation in foundations trenches etc. in all kinds of soil where pick-jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. complete in all respects. construction of shoulder with good quality earth obtained from borrow pits including compensation of earth, loading, unloading, carriage to site of work, spreading, grading to required and compacting to meet requirement as per clause 3003 of mort&h specification. prevention courses (stress absorbing membrane width less than 6mm laying of a stress absorbing membrane over a cracked road surface after cleaning the road surface, using modified binder crmb-55 complying with clause 517 @ 1.1kg per sqm and crushed stone aggregates of specified grading, spr
Sector: Road development