Description: RAIN WATER FROM BUS STAND AREA AT SRI MUKTSAR SAHIB DISTT MUKTSAR SAHIB Name of Work DRAIN OFF RAIN WATER FROM BUS STAND AREA AT SRI MUKTSAR SAHIB DISTT SRI MUKTSAR SAHIB
Details: Carriage of Material i) Earth,Surkhi, Sand, Earth, Fly Ash, Bajri, Ballast, Stone boulders, Kankar and building , Earth. Dismantling concrete Cement concrete plain 1:6:12 or leaner mix Dismantling concrete Cement concrete plain 1:2:4 mix Taking out existing CC interlocking paver blocks from footpath/ central verge/pavement, including removal of etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in- Charge. Cement concrete 1:6:12 with stone ballast 40mm gauge(ii) mixing by mechanical means using concrete mixer volumetric type Providing,Stringingout, cutting, Jointingand testingof ISIMarked D.I.Pipe (S&S) asper IS8329and layingthesame in trenches to correct alignment andgradients, jointe dwith rubber tytonjointsfittedcompleteincludingall cartage, cost of rubber ring(f) 300mm i/d pipe lines laid complete Excavation in trenches with stralght
Sector: Water supply and Sewerage