Details: repair of pump chamberpainting two or more coats with syntheticenamel paints in all shades on old wood work or metallic or plastered or concrete surface to give an even shade including rubbing down old paint. white washing 3 coats inside of pump chamber. finishing wall with exterior decorative cement based paint such as snowcem robbiacem etc. on new work in two coats to give even shade. supplying & fixing glass panes with glazing clips and special metal sash putty of approved make.b) glass panes 4mm or 10.75 kg / sqm exceeding 0.4 sqm area conglomerate floor 50mm thick cement concrete rate 1:2:4 on 100mm thick cement concrete 1:8:16 and 100mm sand filling. upvc rising main for byepassproviding, laying, fixing, jointing, cutting & testing of upvc pipes & specials (10 kg./cm2) including cost of excavation complete in all respects as per isi-4985 standard analysis. (supreme /finolex/prince/jain/kissan make or equivalent make) 110mm i/d (mechanical) sluice valve & sluice valve chambers
Sector: Water supply and Sewerage