Details: compaction of earth work & preparation of sub grade including loosening, leveling of earth 225mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the table 300-2 as per technical clause 305 of mort&h specifications. as per csr 24.4 (c ) providing and laying of brick on end edging 6.83cm wide, 11.11cm long and 22.86cm high half brick deep including excavation, refilling and disposal of surplus earth up to 50mtr complete as per punjab pwd specifications as per csr 24.14 providing, laying, spreading and compacting stone aggregates of grading i to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of binding materials to fill up the interstices of coarse aggregate, watering and compacting to the r
Sector: Road development