Details: excavation by mechanical means (jcb or hydraulic excavator) in trenches for pipe line with straight or open cutting in streets or open area including trimming and dressing sides levelling of beds of trenches to correct grade , cutting joint holes, refilling consolidation ,watering including the cost of dewatering of rainwater , diversion for traffic, night signals providing and fixing and caution boards, crossing over trenches for access to houses, watching fencing etc and removal of surplus soil outside/inside the town involving lead upto 15 mtr. complete in all respect. earthwork upto 1.50 mtr. depth for ordinary soil having gravel upto 40% exceeding 1.5 m depth but not exceeding 2.25 m depth for ordinary soil having gravel upto 40% providing 150 mm sand cushion beneath the pipe including supply and carriage of sand from local choe lead upto 5 km.,including loading and unloading and rehandling if any complete in all respect. providing, laying, fixing and testing m.s. pipe lines as
Sector: Water Resource Department