Details: dismantling (8.5) dismantling brick work tile, masonry or tile lining ((b)) in cement bridges- foundations & sub- structure (21.1) earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil.in ordinary soil (b) mechanical means (b) depth 3 m to 6 m (21.32) plain/reinforcedcement concrete in sub-structure complete as per drawing and technical specifications (e) rcc grade m20 ((a)) height upto 5m ((ii)) with batching plant, transit mixer and concrete pump (f) rcc grade m25 ((a)) height upto 5m ((ii)) with batching plant, transit mixer and concrete pump lining (19.2) dressing side slopes and preparation of sub grade for lining. (19.1) dressing
Sector: Water Resource Department