Details: providing and applying primer coat with bitumen emulsion ss on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85kg/sqm complete as per technical clause 502 of mort&h specifications bituminous macadam 50mm to 75mm thickness (grading- ii) providing and laying bituminous macadam 50mm thick (compacted) with continuous type hot mix plant using crushed aggregates of specified grading premixed with bituminous binder vg-30 @3.4%, carriage to site of work, laid over a previously prepared surface with paver finisher mechanical to the required grade, level and alignment and rolled to achieve the desired compaction complete as per technical clause 504 of mort&h specifications providing and applying tack coat with grade bitumen vg-10 using bitumen pressure distributor at the rate of 0.40 kg per sqm on the prepared bituminous surface/granular surface treated with prime coat after cleaning the surface complete as per technical specificati
Sector: Industry Development