Details: civil work designing of stp which includes details tank size and mechanical equipment and electrical work. preparation of structural design of civil work. civil workscreen chamber, collection tank, mbbr tanks, tube settler, treated effluent tank, sludge drying beds and foundations of pumps, filters etc.) electrical and mechanical equipment’s: -(supply of equipment such as blowers, motors, pumps, diffusers, mbbr media and tubedeck media, filters along with filter media and other required fittings, electrical panel and electrical wiring/fittings along with all required pipeline within the stp boundary limit. operation and maintenance cost for 5 years. excavation in trenches with straight or open cutting in streets, lanes or in open area with 3d/jcb or excavator including manually dressing bed, trimming sides and side slopes for sewers and manholes to full depths as shown in drawings, including, dressing to correct sections and dewatering, provision for diversion for traffic, protection o
Sector: Irrigation