Details: ordinary jungle clearance of both banks of running distributaries, minors and drains with discharge upto 9cum/s including boundary road :- ((a)) discharge upto 1.5 /s earth work in excavation in foundations trenches etc. in all kinds of soil where pick-jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. excavation in soil (any type) using hydraulic excavator ck 90 with hydraulic excavator of 0.9 bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. dressing of earth work: new work or remodeling work. excavation of soil using hyraulic excavator and hydraulic tractor trolly i/c cutting a
Sector: Water Resource Department