Details: civil worksdismantling brick edging include sorting & stacking dismantled materail excavation in soil (any type) using hydraulic excavator ck 90 excavation with hydraulic excavator of 0.9 bucket capacity including cutting trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lift and combined lead up to 60 mtr compaction of earth work & preparation of sub grade including loosening, leveling of earth 225mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the table 300-2 as per technical clause 305 of mort&h specifications providing and laying of brick on end edging 6.83cm wide, 11.11cm long and 22.86cm high half brick deep including excavation, refilling and disposal of surplus earth up to 50mtr complete as per punjab providing and laying of pcc m-25 brick on end edging 6.83cm wide, 11.11c
Sector: Road development