Details: civil works dismantling of flexible pavements (by mechanical means: dismantling of flexible pavements thickness above 50mm by mechanical means and disposal of dismantled materials up to a lead of 1000 meters, stacking serviceable and unserviceable materials separately as per technical clause 202 of mort&h specifications csr 24.3 (a) construction of granular sub-base by providing material as per grading-iii ( table 400-i of mort&h 5th revision), mixing in a mechanical mix plant at omc,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per technical clause 401 of mort&h specifications csr 24.8 construction of granular sub-base by providing material as per grading-iii ( table 400-i of mort&h 5th revision), mixing in a mechanical mix plant at omc, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, com
Sector: Road development