Details: civil works earth work in excavation in foundations trenches etc. in all kinds of soil where pick-jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within all lead cement concrete 1:8:16 with brick ballast 32mm / 40mm gauge mixing by mechanical means using concrete mixer volumetric type cement concrete 1:2:4 with stone ballast or shingle mixing by manual means steel work in built up tubular pipes (round, square or rectangular hollow tubes etc. isi marked) for flat shed (ie.where no truss work is involved) including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. providing and fixing precoated galvanised iron profile sheets (s
Sector: Road development