Details: crystallizer foundation earth work in excavation in all kinds of soil. all excavation operations manually or mechanically shall include excavation, dressing of sides, ramming of bottoms, lift upto 2 mtr., stacking the material temporarily near the excavated area. cost will also include filling back excavated earth in trenches, plinth, sides of foundations, footings etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer with rammer, plate etc. demolishing of m-15 or richer mix r.c.c. including cutting of reinforcement, stacking of serviceable material and disposal of unserviceable material outside the permissive (a) beams, slabs, columns, footing , machine foundation etc. providing and laying 100 mm thick cement concrete 1:3:6 (1 cement 3 coarse sand 6 graded stone aggregate 40 mm. nominal size) in foundations, machine foundations, footings and bases of columns and under floors including the cost of centring and shuttering supplying and laying stone soling co
Sector: Cooperative Federation