Details: supply of mazdoors for removing debris, malba, , jungle at breach site excavation in soil (any type) using hydraulic excavator and tippers with disposal up to 450 metres. excavation in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes and transporting to lead up to 450 metres complete in all respect, as per drawings, design, specifications & the instructions of the engineer incharge. (lead within 450 metre) laying e.c bags filled with cement concrete 1:3:6 including sewing and laying in position within 30 metres in water complete in all respect. laying e.c bags filled with cement concrete 1:3:6 including sewing and laying in position in dry places within 30 metres complete in all respect. rehandling of earth work with average lead 15 metres complete in all respect, as per instructions of the engineer incharge. extra for puddling of soi dressing of earth work (repair work) extra for dressing of dowels complete in all respect,
Sector: Water Resource Department