Details: dismantling stone pitching or solinga.) stone pitching dry 8.2(a) compaction of earth workc) compaction of earth work & preparation of sub grade including loosening, leveling of earth 225mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the table 300-2 as per technical clause 305 of mort&h specifications. brick on end edgingproviding and laying of brick on end edging 6.83 cm wide, 11.11cm long and 22.86 high half brick deep including excavation, refilling and disposal of surplus earth up to 50 mtr complete as per punjab pwd specifications. 24.14 relaying of recovered material obtained from dismantled road material obtained from road crust as construction of granular sub-base by providing material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at
Sector: Road development