Details: excavation by mechanical means (jcb or hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including trimming and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refillingconsolidation, watering including the cost of dewatering of rain water, diversion for traffic, night signals. providing & fixing caution boards, crossing over trenches for access to the houses, watching, fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect. (b) exceeding 1.5 m depth but not exceeding 2.25 m depth(iii) for semi conglomeratesoil of having gravel/boulder upto 50% excavation by mechanical means (jcb or hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including trimming and dressing sides levelling of
Sector: Water Resource Department