Details: repair work dismantaling of brick work /tile masonary or tile lining.(i) dismantaling of dry brick work making 50 mm x 50 mm furrows making 50 mm x 50 mm furrows 45 degree to the centre line of road and at one metre interval in the existing bituminous wearing coarse including sweeping and disposal of excavated material within 1000 meters lead complete as per technical clause 404 of mort&h specifications (full surface area will be measured for payment.) dismantling of existing road crust containing stone pitching or soiling. (50 mm to 150 mm thick). relaying of recovered material obtained from dismantling of road crust as construction of granular sub-base by providing coarse graded matereal grading-ii spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achive the desired density, complete as per technical clause 401 of mort&h specifications. compaction of earth work & preparation
Sector: Road development