Details: dismantling brick edging as per csr 8.5 (i) dismantling stone pitching or soling. (stone pitching dry) as per csr 8.2 (a) compaction of earth work & prepration of sub grade including loosing,leveling of earth 225mm thick top layer, rough dressing of soil, final dressing of earth to give level camber,watering,rolling with road roller, compacting the bed to achieve minimun dry density as given in table 300-2 as per technical clause 305 of mort&h specifications (in case of link roads earth work to be done by villagers.) as per csr 24.4(c) providing and laying brick on end edging as per csr 24.14 relaying of recovered material obtained from dismentling of road crust using as granular sub base (labour rate ) csr 24.7 construction of granular sub-base by providing material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, complete as per mord technical s
Sector: Road development