Details: special repair of link road b.b. road to khudi kalan making 50 mm x 50 mm furrows 45 degree to the center line of the road and at one metre interval in the existing bituminous wearing coarse including sweeping and disposal of excavated material within 1000 metres lead complete as per technical (full surface area will be measured for payment) csr 24.10 dismantling brick edging as per csr 8.5 (i) providing and fixing brick on end edging as per csr 24.15 providing, laying, spreading and compacting stone aggregates of grading ii to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical specifications (without screening for low volume roads/undersigned) 24.12(ii) credit of materials (from streng
Sector: Road development