Description: Repairing of Operator Cabin and Co operator Cabin of 24 96 Yamuna Dragline at Jayant Project Name of the Work Contract No
Details: Repairing of Operator Cabin & Co-operator Cabin of 24/96 Yamuna Dragline at Jayant Project. Labour charges for Repairing of Operator Cabin & Co-operator Cabin of 24/96 Yamuna Dragline at Jayant Project as per scope of work considering labour cost,Supervisor charge, contractor profit and any other Cost. Cost of laminated Mica board 12mm for back cabin (6' X8' + 6'X8' + 6'X8+ 6'X8'= 192 Sq.ft) Cost of laminated Mica board 12mm for front cabin (10' X5' + 10'X5' + 5'X8' + 5' X 8' = 180 Sq.ft) Cost of 02 Nos. safety glass of side door (5 mm thick) 4 ft X 3 ft + Rubber bead 14 ft Cost of new floor mat Cost of aluminum plate having thickness 1.5 mm Cost of New dooraluminum complete (back Door)/wooden flash Door Cost of Hyd door closer Cost of Adhesive(solution) Cost of heavy duty door lock Cost of door handle Repairing cost of 01 no operator seats Cost seat cover with stitching charges Cost of plywood (12mm) pelmet Cost of plywood for bench of rear cabin (12 mm thick) Cost of curtain clot
Sector: Mining