Description: Providing Pyau drinking water arrangement at two places at Amlohri Project for 75 days Name of Work
Details: Part A Operation of pyau (02 nos.) by engaging sufficient manpower on daily basis as per instruction of EIC. Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with sand with common burnt clay non modular bricks. Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. Providing and fixing Bamboo jaffery/ fencing consisting of superior quality 25mm dia (Average) half cut bamboo placed vertically and fixed together with three numbers horizontal running members of hollock wood in scantling of section 50X25 mm, fixed with nails and G.I wire on existing support complete as per direction of Engineer-in-charge. Total impact of GST for the purpose of CTC
Sector: Mining