Description: On Turnkey Basis Construction of Panehti Dam and Pressurized pipe irrigation Name of Work Construction of composite dam on river Sukhet of Panehti Medium Irrigation Project Tehsil Bamori District Guna to impound minimum Gross capacity of 11 66 MCM minimum Live capacity of 10 00 MCM and minimum Dead storage capacity of 1 66 MCM with maximum submergence of 215 00 Ha land comprising of 0 Ha private land 215 00 Ha Forest Land and 0 Ha government land on turnkey basis with all necessary features required for safety stability of structure for passing designed flood of 1030 23 cumecs as per designed criterion of WRD specifications relevant IS code and technical circulars issued by department from time to time The work also includes marking FTL and MWL line on the field and preparation of land acquisition cases under The right to fair compensation and transparency in land acquisition rehabilitation and resettlement Act 2013 State consent land purchase policy 2014 Construction of a pressurised Pipe irrigation system to supply water through the Rising Gravity mains for micro irrigation to deliver at farmers field upto 5 0 ha with a duty of 0 35 lit sec ha and maintained up to 5 0 ha chak keeping the discharge of minimum 10 times the duty at 1 0 hectare and at least 25 Meter Residual Head at each 5 0 ha chak for Micro Pressurized Irrigation Drip Sprinkler by rotation with a total power requirement of 1 07 MW in the Culturable command area of 2850 hectare out of gross command area 3450 hectare fully covering the entire compact and contiguous possible arable area and any area increase decrease in CCA within beyond the GCA shall be permitted with written approval of Chief Engineer as per the index map for Micro Irrigation System under Panehti Medium Irrigation Project It includes all activities starting from survey investigation designing procurement construction laying installing etc of gravity mains main line branch lines distribution network controlling and regulation system etc for supply of water for irrigation under pressure with SCADA and automation and construction of approach roads as per PMSY The work including defect liability period for 60 months and Management Operation Maintenance MOM of complete commissioned system MOM for the period of 60 months after completion MOM period is further extendable for another period of 60 months
Details: Construction of composite dam on river Sukhet of Panehti Medium Irrigation Project Construction of composite dam on river Sukhet of Panehti Medium Irrigation Project
Sector: Water Resource Department