Details: provision for condition mapping including architectural drawings and sketch up and other software of entire fort complex to ascertain actual quantum of work in conservation and restoration provision for clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared.complete. provision for providing 20-25 mm thick lime plasterincluding racking of joints preparation of surface laying fresh lime plaster in (1:1:1 lime sand surkhi with natural additives )including slacking of lime, mixing of mortar in gatta, transportation of mortar ,plastering, beating ,curing with all leads and lifts etc complete provision for coping/water tightening with (1:1 mixed with traditional additives) with 50 % brick zeera including slacking of lime mixing in gatta transportation of mortar ,curing with all leads and lifts etc compl
Sector: Museums