Description: COMPLETE MACHINING OF STATOR LIFTING BEAM CENTRE ASSY 1 NOS AS PER PQR HGG01 2025 AND DRG 12515112712 REV 00 AND LIFTING BEAM ARM ASSY 12 NOS AS PER DRG 12515112714 REV00 TOTAL F M WT 109939 KG SET R M WT 112930 KG SET SCRAP GENERATED 2991 KG S Name of Work Services
Details: COMPLETE MACHINING OF STATOR LIFTING BEAM CENTRE ASSY-1 NOS AS PER PQR-HGG01/2025 AND DRG 12515112712 REV-00 ANDLIFTING BEAM ARM ASSY-12 NOS AS PER DRG 12515112714 REV00. TOTAL F/M WT=109939 KG/SET, R/M WT=112930 KG/SET.SCRAPGENERATED=2991 KG/SET.FABRICATED MATERIAL WILL BEISSUED AS PER THE DRAWING NO. 12515112712 AND 12515112714. COMPLETE MACHINING OF STATOR LIFTING BEAM CENTRE ASSY-1 NOS AS PER PQR-HGG01/2025 AND DRG 22515111715 REV-00 ANDLIFTING BEAM ARM ASSY-08 NOS AS PER DRG 22515111716 REV01. TOTAL F/M WT=5939.05 KG/SET, R/M WT=6079 KG/SET.SCRAPGENERATED=139.95 KG/SET.FABRICATED MATERIAL WILL BEISSUED AS PER THE DRAWING NO. 2515111715 AND 22515111716. COMPLETE MACHINING OF STATOR LIFTING BEAM CENTRE ASSY-1 NOS AS PER PQR-HGG01/2025 AND DRG 22515122710 REV-00 ANDLIFTING BEAM ARM ASSY-8 NOS AS PER DRG 22515122712 REV-00.TOTAL F/M WT=4145 KG/SET, R/M WT=4270 KG/SET.SCRAPGENERATED=125 KG/SET.FABRICATED MATERIAL WILL BE ISSUEDAS PER THE DRAWING NO. 22515122712 AND 22515122710
Sector: Power Sector