Description: Survey Soil investigation Design Construction and commissioning of Sewerage network of 252 80 KM trunk main of 6 03 KM including 5 intermittent pumping Stations 2 STP having capacity 24 MLD and 12 MLD respectively along with Pumping Station excavatio Name of Work Survey Soil investigation Design Construction and commissioning of Sewerage network of 252 80 KM trunk main of 6 03 KM including 5 intermittent pumping Stations 2 STP having capacity 24 MLD 12 MLD respectively along with Pumping Station excavation bedding road restoration and property connection in Khandwa Nagar Palik Nigam area including Operation and maintenance for 10 years after satisfactory commissioning
Details: Survey, Soil investigation, Design, / Construction and commissioning of Sewerage network of 252.80 KM Survey, Soil investigation, Design, / Construction and commissioning of Sewerage network of 252.80 KM, trunk main of 6.03 KM including 5 intermittent pumping Stations, 2 STP having capacity 24 MLD & 12 MLD respectively along with Pumping Station, excavation, bedding road restoration and property connection in Khandwa Nagar Palik Nigam area including Operation and maintenance for 10 years after satisfactory commissioning.
Sector: Urban Authority