Description: Repair and Maintenance of 500 KVA Transformer installed At 33 and 0 44 KV Substation of TSU BSF Tekanpur Name of Work Repair and Maintenance of 500 KVA Transformer installed At 33 0 44 KV Substation of TSU BSF Tekanpur
Details: Earthing with copper earth plate 600 mm X 600 mm X 3 mm thick including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe of 2.7 metre long etc. with charcoal/ coke and salt as required. Providing and fixing 25 mm X 5 mm copper in 40 mm dia G.I. pipe from earth electrode including connection with brass nut, bolt, spring, washer excavation and re-filling etc. as required. Providing and fixing 25 mm X 5 mm copper on surface or in recess for connections etc. as required. Rewinding of 3 Phase i.e. Phase R, Phase Y, Phase B, high tension electrical winding (33 KV) of 500 KVA power transformer along with suitable size(same size of existing burnt winding) copper conductor and insulating materials (cost after deducting cost of the burnt winding) Rewinding of 3 Phase and neutral i.e. Phase R, Phase Y, Phase B and neutral low tension electrical winding (440 V) of 500 KVA power transformer along with suitable size (same size of existing
Sector: Police and Internal Security