Details: clearing jungle including uprooting ofrank vegitation, grass, brush wood, trees and saplings of girth upto 30 cm meassurred at a height of 1 meter above ground level and removal of upto a distance of 50 m outside the periphery of the area cleared. excavation work in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dresing of sides and ramming of bottoms lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. all kind of soil filling available excavated earth ( excluding rocks) in plinth side of foundation, under floors in layers not exceeding 20 cm in depth including, watering, ramming consolidating and dressing completelead up to 50 m and lift up to 1.5 m, providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nomi
Sector: Police and Internal Security